Street Repair Projects for 2010 and 2011
2010 Patching: 23rd Street (Patches on top of and next to the last group of patches on this street.) (82 patches) Grimes Ave. from 16th to 10th (12 patches) Hempstead from 12th to 8th (5 patches) Brigs from 12th to 8th (10 patches) Jefferson from the City shop to 6th (30 patches) Monroe from 7th to 6th (3 patches) Harrison between 5th and 6th, on the north side (big hole) Harrison from 2nd to Main (16 patches) Grand Park from Southview to Little Fawn (17 patches) The north return of D Street at Fillmore Ave. (1 patch) 6th Street on the east side of the street, just north of Jackson 7th Street from Jackson to Jefferson (16 patches) 2010 Resurfacing: 16th Street from Burlington to Grimes Washington from Main to B Court from Washington to Burlington 2010 Reconstruction: Lowe from 4th to 2nd Lowe from Main to C Cromwell from Burlington to Briggs Madison from 6th to 4th 3rd from Harrison to Madison Briggs from Forest to Morgan 2011 Reconstruction: 2nd from Fillmore to Harrison 5th from Fillmore to Madison Lowe from D to F Stone from 4th to 3rd Stone from B to D 2011 or 2012 Resurfacing (Federal Aid): Fillmore from Main to Maple 2012 Reconstruction (Federal Aid): D from 120 feet south of Madison to Burlington Kirkwood from 7th to 5th
|